As the number, complexity, and scope of large engineering projects (LEPs) increase worldwide, the huge stakes may endanger the survival of corporations and threaten the stability of countries that approach these projects unprepared. According to the authors, the "front-end" engineering of institutional arrangements and strategic systems is a far greater determinant of an LEP's success than are the more tangible aspects of project engineering and management.<br /> <br /> The book is based on an international research project that analyzed sixty LEPs, among them the Boston Harbor cleanup; the first phase of subway construction in Ankara, Turkey; a hydro dam on the Caroni River in Venezuela; and the construction of offshore oil platforms west of Flor, Norway. The authors use the research results to develop an experience-based theoretical framework that will allow managers to understand and respond to the complexity and uncertainty inherent in all LEPs. In addition to managers and scholars of large-scale projects, the book will be of interest to those studying the relationship between institutions and strategy, risk management, and corporate governance in general.<br /> <br /> Contributors<br /> Bjorn Andersen, Richard Brealey, Ian Cooper, Serghei Floricel, Michel Habib, Brian Hobbs, Donald R. Lessard, Pascale Michaud, Roger Miller, Xavier Olleros.
评分
评分
评分
评分
本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度,google,bing,sogou 等
© 2025 qciss.net All Rights Reserved. 小哈图书下载中心 版权所有