Because the U.S. Air Force does not have an effective way of allocating limited funding for depot-level repair across weapon systems and calculating the readiness implications of such allocations, this report describes a methodology, the Closed-Loop Planning System, that estimates the effect of depot repair funding allocations on aircraft availability.
评分
评分
评分
评分
本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度,google,bing,sogou 等
© 2025 qciss.net All Rights Reserved. 小哈图书下载中心 版权所有